PUMPING STATIONS

Total of 137 pumping stations built and were put into operation.
Installation and commissioning of more than 400 pumping units.
- Height of pressure part: 15 - 96m.;
- Project capacity: from 3 to 40 cubic meters/sec;
- Installation of metal structures: a 2500 ton;
- Earthworks: 15 million Cubic meters;
- Concrete work: 50 thousand Cubic meters;
Construction of the pipeline: ᴓ 630 - 2600mm - 60000 meters.