UZBEKISTAN GTL PROJECT

ПРОЕКТ UZBEKISTAN GTL- Site preparation: 1 250 000 square meters;
- Total amount of earth work: 8 297 000 cubic meters;
Excavation: 5.3 million cubic meters;
Embankment: 2.997 million cubic meters;
Type of soil: sandy loam, aleurolite, pebbles;
The method of sealing:
Mechanical compaction, layer by layer