- Estimated capacity: 600 cubic meters / day;
- Earthworks: 200000 cubic meters;
- Concrete work: 500 cubic meters;
- Prefabricated reinforced concrete: 100 cubic meters;
- Installation of metal structures: 150 tons;
- Installation and commissioning of pumps 10 pcs